Programming 2 hand controls - 2 beds – Select Comfort Precision Comfort Adjustable Foundation User Manual

Page 21

Advertising
background image

Precision Comfort™ Owners Manual

21

STEP 6

Repeat Step 4 and Step 5 with hand control 2.
Two hand controls are now programmed to
operate two beds.

STEP 1

Locate the power down box for bed 1 and
press the learn button for 1 second and
release (FIGURE 16).

STEP 2

On hand control 1, simultaneously press and
hold the POS 1 and the head massage on/off
buttons
(FIGURE 17). The transmission
indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.

STEP 3

Repeat Step 1 and Step 2 with hand control 2.
STEP 4

Locate the power down box for bed 2 and
press the learn button for 1 second and
release. (FIGURE 16).

STEP 5

On hand control 1, simultaneously press and
hold the POS 1 and the head massage

on/off

buttons

(FIGURE 17). The transmission

indicator light will flash slowly and then flash
rapidly. Continue to hold for 5 seconds and
then release the buttons.

The six step procedure below is required to program 2 hand controls to operate 2 beds.
Before beginning, make certain the beds are plugged into a working grounded electrical
outlet.

PROGRAMMING

2 hand controls - 2 beds

HAND CONTROL 1

BED 1

HAND CONTROL 2

BED 2

LEARN

BUTTON

FIGURE 16: Power down box learn button.

POWER

DOWN BOX

IF PROGRAMMING FAILS, INITIATE THE
PROGRAMMING PROCEDURE A SECOND
TIME.

NOTE

POS 1

BUTTON

TRANSMISSION

INDICATOR LIGHT

FIGURE 17

HEAD MASSAGE

ON/OFF BUTTON

Advertising