Framing dimensions – Superior CFST-CMN User Manual

Page 7

Advertising
background image

NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.

7

Figure 6

Figure 7

Figure 8

C

A

B

Gas

Line

CFPF FRAMING SPECIFICATIONS

CFPF APPLIANCE SPECIFICATIONS

Gas Line

Energy Wall

2 x 4 Outside

Wall

Drywall

Drywall

*

Bracket

Bracket

Framing Top View

*

¹⁄₂" (13mm) Required Air Space Clearance

A 22

³⁄₄" (578 mm)*

B 40

¹⁄₈" (1016 mm) Min.

C 43" (1092 mm) Min.

Framing Dimensions

End View

18"

(457 mm)

20"

(508 mm)

Open End

5

¹⁄₂"

(140 mm)

31

³⁄₄"

(806 mm)

24"

(610 mm)

J Box/Gas Line

Opening

(Both Sides)

4"

(102 mm)

4

¹⁄₂"

(114 mm)

Front View

(CFPF)

42

³⁄₄"

(1086 mm)

40"

(1016 mm)

34"

(864 mm)

20"

(508 mm)

37"

(940 mm)

⁵⁄₈"

(16 mm)

Top View

3

¹⁄₈"

(79 mm)

*Note: Framing dimensions
calculated for

⁵⁄₈"

drywall finish.

Advertising
This manual is related to the following products: