Connecting the base, Putting the telephone into operation – Siemens 4110 User Manual

Page 14

Advertising
background image

13

Putting the telephone into operation

Gigaset 4110isdn, GBR, A31008-G4110-B102-2-7619

Inbetriebnahme.fm

4.9.02

Step

by

step

Connecting the base

●

Only use the plug-in power supply unit provided (as identified on the
underside of the base).

Plug-in power sup-
ply unit
(220/230 V with
mains cable)

●

Plug the small
mains cable
connector
into
the socket,

●

Place the cable
in the cable
channel,

●

Connect the
plug-in power
supply unit to
the socket.

●

Plug the phone cable’s connector
into the socket (latches into position),

●

Place the cable in the cable channel,

●

Plug the phone connector into the
phone socket/NTBA.

Phone connector with phone cable

Key for
registering other
handsets
(see page 18)

1

2

Info

Only use the cable provided.

!

Advertising