Siemens 2015 User Manual

Page 10

Advertising
background image

Putting the equipment into operation - step by step

1

Gigaset 2015 plus, GBR: A30852-X-1105-B301-1-7619

kap02.fm5

29.10.99

Putting the equipment into operation - step by step

Follow the installation and setup instructions “step by
step” as described in the following:

1st step: reading the safety information

2nd step: checking the contents of the package

When delivered, the package contains the following:

●

one Gigaset 2015 plus base station (see also label
with CE sign on lower part of base station)

●

one Gigaset 2000S standard handset (see also mark-
ing on rear of handset),

●

one telephone connecting cable with Mini-Western
plug and telephone plug

●

one power connecting cable with Mini-Western plug
and power supply unit,

●

one cover for battery compartment of handset

●

one carrying clip for handset

●

two batteries

●

one set of operating instructions

Before starting, make sure you have studied
the safety information carefully!

Advertising