English – Seiko 6M25 User Manual

Page 19

Advertising
background image

English

19

To measure the hourly rate of operation

Use the stopwatch to measure
the time required to complete 1
job.

1

Tachymeter scale indicated by
Second hand gives the average
number of jobs accomplished per
hour.

2

“180” (tachymeter scale figure) x 1 job
= 180 jobs/hour

Ex. 1

Ex. 1

Ex. 2: If 15 jobs are completed in 20 seconds:

“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour

Second hand:
20 seconds

Tachymeter scale:
“180”

Advertising
This manual is related to the following products: