Installing the new water heater (cont'd), Venting (cont'd) – State SDV 75 70 NE/PE User Manual

Page 17

Advertising
background image

17

Installing the New Water Heater (cont'd)

Venting (cont'd)

INSTALLATION SHOWING USE OF PVC, ABS OR

CPVC PIPE FOR INLET AND OUTLET VENT PIPING:

Inlet piping through any type wall.

EXTERIOR WALL

SILICONE

SEALER

SILICONE SEALER

SCREW

SCREW

SCREW

SCREW

SCREEN AT

OUTLET

FLUE MOUNTING

ADAPTOR

VENT CAP MUST

BE POSITIONED

DOWNWARD

1

1

2

" MIN. EXTENSION

THROUGH

EXTERIOR WALL

FLUE MOUNTING ADAPTOR

CONNECTING VENT TO BLOWER

1. If making an immediate horizontal run of vent off the

blower, one 3

″ PVC inlet and one 3″ ABS outlet

Schedule 40 street elbows are required. Place the elbow

in the required direction on the blower and using 3 sheet

metal screws, attach the elbow.

2. If there is to be a vertical run of vent from the blower, the

3

″ PVC inlet and the 3″ ABS outlet pipes must be

attached to the blower and venting hood, using 6 sheet

metal screws.

CAULK

JOINTS

CAULK

JOINTS

VENT TO

OUTDOORS

INTAKE FOR

COMBUSTION AIR

FLUE PRODUCTS

DISCHARGE PIPE

AIR INTAKE

PIPE

INSTALLATION SHOWING USE OF (OPTIONAL)

DELUXE HORIZONTAL VENT KIT:

Typical installation.

If this concentric flue, through the wall type of venting

system is preferred, the vent kit can be ordered from the

Service Parts Dept. under kit #9002749. See also pages 36

and 37. Installation instructions are provided with the kit.

VENTING THROUGH A ROOF

Two 3

″ inlet and outlet PVC Schedule 40 45° vent caps are

supplied.

A 5’ section of 3

″ ABS Schedule 40 outlet vent pipe is sup-

plied. More may be required and must be supplied locally.
1. The water heater requires its own (separate) venting

system.

Advertising