English, Ex. 1 – Seiko 7T32 User Manual

Page 15

Advertising
background image

English

15

To measure the hourly rate of operation

Use the stopwatch to measure
the time required to complete 1
job.

1

Tachymeter scale indicated by
STOPWATCH second hand gives
the average number of jobs ac-
complished per hour.

2

STOPWATCH
second hand:
20 seconds

Tachymeter scale: “180”

“180” (tachymeter scale figure) x 1 job
= 180 jobs/hour

Ex. 1

Ex. 1

Ex. 2: If 15 jobs are completed in 20 seconds:

“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour

MIN.

5

25

30

20

10

Advertising