3 INSTALLATION

3.1

General

This section provides detailed information required to
successfully installing AP25 Autopilot system.
The AP25 system includes several modules that need to be
mounted in different locations on the boat, and also need to
interface with at least three different systems on the boat:
• The boat's steering system
• The boats electrical system (input power)
• Other equipment on board
In addition, the advanced capabilities of the AP25 require the
installer to perform a series of settings and tests to verify proper
operation of the system, refer to the check list below.

3.2

Installation checklist

1. Determine the system configuration you are installing

(Figure 3-1)

2. Perform the hardware installation (Page 67)
3. Connect SimNet devices to SimNet (page 83)
4. Connect NMEA2000 devices (page 86)
5. Connect NMEA 0183 devices (inputs and outputs, page 89)
6. Perform Set-up (Section 4, page 95)
7. Perform dockside autopilot tests (refer to Operating

Instructions, page 15)

a) Test all stations (if applicable) - lock/unlock - active/

inactive

b) Test Non-Follow Up mode
c) Test Follow-Up mode
d) Test AUTO mode
e) Test NAV mode and input interfaces
f) Test WIND and WIND

N

modes (if sailboat) and input

interfaces

g) Test interface outputs to external equipment (if

connected)

8. Perform sea trial settings (Page 114)

a) Rudder zero