Operation, Opera t ion – Servis-Rhino 4211B User Manual

Page 77

Advertising
background image

OPERATION

4211B 02/10

Operation Section 4-31

© 2010 Alamo Group Inc.

OPERA

T

ION

Another method for large dirt piles is to build a ramp
approach to the pile.

It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.

Advertising