Nstallation – Southbend Marathoner User Manual

Page 15

Advertising
background image

M

ARATHONER

G

OLD

&

S

ILVER

S

TAR

G

AS

C

ONVECTION

O

VENS

I

NSTALLATION

7. Insert two bolts (items “A” in the following diagram) up through the top of the lower oven and screw

them into the threaded holes in the bottom of the top oven. Tighten these bolts and the screws that you
did not tightened in the previous step.

A

A

INSTALLATION

8. Assemble the gas piping shown in the following drawing. Be sure to check all connections for leaks

once the oven has been installed.

3/4" Elbow

3/4" x 13-1/4" Pipe

3/4" Union

3/4" Tee

O

PERATOR

S

M

ANUAL

1181887

REV

3 P

AGE

15

Advertising