Pfd1/pfs1 – operating instructions, Vi – dismantling and repair – Saint Gobain Vidros PFD1 User Manual

Page 7

Advertising
background image

PFD1/PFS1 – OPERATING INSTRUCTIONS

INDEX

DATE

N°

03

27/09/01

DC01020US

6/11


If the pump starts, check that the following was not the cause:

•

The air/nitrogen connections (See III.3.1),

•

The air/nitrogen quality,

•

Has the pump been serviced correctly? (See V.2 Preventive maintenance).


Before dismantling the pump check the following:

•

The air/nitrogen supply is “OFF”,

•

The chemical and discharge lines are empty and there is no pressure,

•

All in line valves are closed,

•

You follow your local Health and Safety Regulations with regard to particular chemicals.

V.2 – Preventive Maintenance

V.2.1 – Continuous Operation


When the pump is used continuously, it is necessary to replace the following parts every year:

•

Shaft composite rings

P/N 7135F

•

Central shaft

P/N 2615

Important: these parts should always be replaced together.

During routine maintenance checks, examine the following parts and change them if necessary:

•

Bellows

P/N 2613 (PFD) or 2613S (PFS)

•

Shuttle valve

P/N 2701

•

Viton bellow O.ring

P/N 2725

•

Body O.ring

P/N 2739

•

Manifold O.ring

P/N 2745

•

Lip seal

P/N 2711 (PFD) or 2711A (PFS)

•

PTFE

sleeves

P/N 7220

•

Silencers

P/N 7185

•

Ball valves

P/N 2712

V.2.2 – Intermittent operation


If the pump is used intermittently, it is advised to replace all wearing parts every 18 months (shaft
composite rings and central shaft) and to check other parts (bellows, shuttle valve, lip seal...).
If the pump is left standing full of chemical for long periods all the Viton O.rings should be replaced.

V.3 – Comments


If the pump is used to pump hot chemicals in excess of 140°F (60

°

C) the preventive maintenance

schedule time scale should be divided by 2:

•

Every 6 months check as for continuous operation,

•

Every 9 months check as for intermittent operation.


The above is based on SGPPL ASTI's experience.
SGPPL ASTI cannot be held responsible for premature failures if the pump is misused or
damaged due to an incorrect application.

VI – Dismantling and Repair


Attention:
Part numbers quoted in this manual are those used on a “standard” PFD/PFS pump. Before
ordering, please check the spare parts list, the section view of the pump and the part numbers table (see
encl. documents).

Advertising
This manual is related to the following products: