Install mounting blocks and wax ring – Kohler Toilet K-3900 User Manual

Page 15

Advertising
background image

4. Install Mounting Blocks and Wax Ring

Position the mounting blocks over the mounting holes.

Secure each of the mounting blocks with two of the supplied lag bolts.

Position a wax ring on the flange.

Connect the Supply Hose to the Toilet

Slide the supply hose outlet into the toilet water inlet.

Slide the clip over the flanges on the supply hose and inlet. Make sure both flanges rest in the gap
in the clip and are firmly held in place.

CAUTION: Risk of property damage.

It is critical that the supply hose be firmly secured by the

clip. The supply hose could be displaced when under pressure if the clip is not correctly installed,
resulting in water damage.

Confirm the clip is firmly holding the supply hose in place. The clip will be able to rotate freely
with no significant resistance when properly installed.

For Through-
the-Floor
Supplies Only

Lag Bolt

Wax
Ring

For Wall Supply
Installations Only

Hose Should Face
Down When Through
Floor

Clip

Flanges

Supply
Hose

Kohler Co.

15

1132336-2-D

Advertising