ASSEMBLY
NOTE: Hand tighten bolts and nylon nuts until machine is fully assembled.
Z
STEP 2
Slide Main Top Beam (4) down onto Rear Upright (2) and Main Upright(3) and secure using:
2 x (88) Bolt
8 x (84) Washer
2 x (90) Bolt
4 x (105) Nylon Nut