Caution – Kobe Range Hoods CH7648SQB User Manual

Page 11

Advertising
background image

9

STAND ALONE INSTALLATION

*** This installation only applies if installing with
the CH1120DC duct cover.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.

•

Decide the location of the venting pipe
from the hood to the outside. (Figure 8)

•

A straight, short vent run will allow the
hood to perform more efficiently.

•

Try to avoid as many transitions, elbows,
and long run as possible. This may
reduce the performance of the hood.

•

Temporarily wire the hood to test for
proper operation before installing.

•

Important: Peel protective film off the
hood and duct covers, if any.

•

Use duct tape to seal joints between pipe
sections.

•

If necessary, prepare back wall frame with
cross

framing

lumber

for

secure

installation.

•

Using references in TABLE 2 and
measurements on pages 19-21, determine
the level of the lumber. (Figure 9)

Hood Preparation before
Installation

•

If necessary, attach two rubber stands
(provided) with 3M adhesive tapes
(provided) to the back corners of the
hood.

•

Attach the outer duct cover-mounting
bracket {K} (provided) to the hood-
mounting bracket {F} (provided) with two
(3/16” x 1/2”) screws (provided) as shown
in Figure 10.

•

Attach the hood-mounting bracket {F} to
the back of the hood with six (3/16” x 1/2”)
screws (provided) as shown In Figure 11.

Hood Installation

CAUTION

: If moving the cooking range

to install the hood is necessary, turn off the
power on an electric range at the main
electrical box. SHUT OFF THE GAS BEFORE
MOVING A GAS RANGE.


Figure 8










Figure 9










Figure 10










Figure 11







Advertising