Ab a b b, Enclosure installation – Kohler CFI230J User Manual

Page 6

Advertising
background image

6

CFI230J

23

CFI230J

Remove wall channel from jamb and place

against mark on wall

Adjust wall jamb until glass is parallel to the

edge of the tray ‘A’. When jamb is vertical mark

edge of wall channel on the wall ‘B’.

STEP

1

ENCLOSURE INSTALLATION

Non Water Delivery Side only

Loosely fit wall channel into glass panel jamb

STEP

2

STEP

4

STEP

3

Carefully lift the assembly onto the tray. The end

of the glass panel fits into slot ‘A’ on the tray.

The wall channel end sits on the flat section of

the tray ‘B’

Fit roller securing caps to both top roller brackets.

Caps will ‘click’ and lock in place

STEP

35

STEP

37

STEP

36

Lift bottom roller up and tighten the fixing

screw with a 3mm allen key.

Fit the cap to cover the screw

A

Cut the 2 metre pipe

to size. Measure from

the centre line of the

connector.

Bottom Entry

‘A’ = 1750mm

Top Entry

‘A’ = 320mm

STEP

34

Bottom Entry

Top Entry

Connect pipework

A

B

A

B

B

±0mm

Advertising