Assembly – Keys Fitness StrenghtTrainer ST-OBA2 User Manual

Page 9

Advertising
background image

9

NOTE: Hand tighten bolts and nylon nuts until machine is fully assembled.

Assembly

STEP 5:
Attach the leg developer (#5) between the brackets on the front of the front base ( #4) with
one bolt M10X75 (#38), two washers 10 (#43) and a nylon M10 (#45) nut.

Push a roller tube (#13) through the upper and lower holes in the leg developer and through
the tube welded to the back of the front base. Push a foam roll onto each side of each tube.

Push the threaded end of the leg developer safety hook (#35) through the small welded tube
across the front of the front base secure with one small nylon nut M8 (#46).

Attach the arm curl pad to the arm curl post (#6) with two bolts M8x20 (#41) and two wash-
ers 8 (#44). Push the arm curl post down into the top of the front base, adjust and secure
with one small knot bolt M12x60mm (#30) installed from behind the front base.

Congratulations!!! You have completed assembly of your ST-OBA2.

Advertising