Kobe Range Hoods CH0130SQB (30") User Manual

Page 12

Advertising
background image

9

STAND ALONE INSTALLATION

***Follow these installations only if installing with an optional duct cover:

Preparation Before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD,

PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.

•

Decide the location of the venting pipe from the

hood to the outside. Refer to Figure 9.

•

A straight, short vent run will allow the hood to

perform more efficiently.

•

Try to avoid as many transitions, elbows, and long

run as possible. This may reduce the performance
of the hood.

•

Use duct tape to seal the joints between pipe

sections.

•

If necessary, prepare back wall frame with cross

framing lumber for secure installation.

•

Using references in Table 2 and Measurements

and Diagrams on pages 19-20, decide the level of
the lumber. Refer to Figure 10.

Hood Preparation Before Installation

•

Temporarily wire the hood to test for proper

operation before installing.

•

Important: Peel protective film off the hood

and the duct cover (if any).

•

Attach ducting transition to hood exhaust with ten

(3/16” x 3/8”) screws (provided). Refer to Figure
11.

•

Use eight (3/16” x 3/8”) screws (provided) to

attach the two hood-mounting brackets (provided)
to the back of the hood. Refer to Figure 12.

Hood Installation

CAUTION: If moving the cooking range is

necessary to install the hood, turn off the power in
an electric range at the main electrical box. SHUT
OFF THE GAS BEFORE MOVING A GAS RANGE.

1. Using references in Table 2 and Measurements

and Diagrams on pages 19-20, mark the leveling
point of the hood. Position two mounting screws
(not provided) on the wall, leaving 1/8” away from
the wall. Refer to Figure 13












Figure 9









Figure 10

Figure 11

Figure 12

Advertising