Hydronic piping, Installation & operation manual – Lochinvar KNIGHT 399 - 800 User Manual

Page 39

Advertising
background image

Installation & Operation Manual

39

6

Hydronic piping

(continued)

EXPANSION TANK

AIR SEPARATOR

PRESSURE REDUCING
VALVE

BACK FLOW
PREVENTER

BALL VALVE
(TYPICAL)

UNION (TYPICAL)

PRESSURE RELIEF
VALVE

FLOW CHECK
VALVE (TYPICAL)

INDIRECT DHW
TANK

BOILER

TEMPERATURE / PRESSURE
GAUGE

PRESSURE GAUGE

DRAIN

DRAIN POINT
(TYPICAL)

BOILER CIRCULATOR

COLD WATER IN

ANTI-SCALD
MIXING VALVE

SYSTEM SUPPLY SENSOR
(WHEN USED)

SYSTEM CIRCULATOR

TO

SYSTEM

FROM SYSTEM

DOMESTIC
HOT WATER
CIRCULATOR

HOT WATER OUT

MAKE UP WATER

NOT TO EXCEED 4 PIPE DIAMETERS
OR A MAXIMUM OF 12" APART

DIRT SEPARATOR

(RECOMMENDED)

MAY SUBSTITUTE

LOW LOSS HEADER

Figure 6-7 Single Boiler - Primary/Secondary Piping

NOTICE

System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in operation to
prevent short cycling and high limit issues.

Advertising