Caution, Gate arm installation (cont.), Choosing good harmonics – Linear SWR User Manual

Page 7: Installing the gate arm on the operator, Setting the arm lengths

Advertising
background image

SWR

• SWC • SWD Swing Gate Operator Installation Guide

- 5 -

227965 Revision X22 8-11-2011

Gate Arm Installation (Cont.)

Choosing Good Harmonics

Good harmonics are necessary to minimize wear and tear
on the operator. The gate will have smoother starts and stops
when the arm is installed with good harmonics. Figure 5
shows an example of good and bad arm harmonics.

Installing the Gate Arm on the Operator

The hex cap screws (see Figure 6) in the side of the crank
assembly are shipped loose for placement on the operator
drive shaft. Once in place, tighten these cap screws in place
by applying 75 ft-lbs of torque. If it becomes necessary to
remove the crank, you can do so by loosening these bolts.
The arm can also be disconnected for manual operation of
the gate by removing the disconnect pin.

Setting the Arm Lengths

Most installations will use the standard dimensions specifi ed.
The dimensions shown in Figure 7 can be used to adjust and
set the arm. If non-standard mounting is required, contact
the factory for information.

Once the arm lengths have been determined, use clamps
to temporarily attach the solid bars to their sections of
rectangular tubing. If clamps are unavailable, you may also
tack weld the parts in place. It is recommended that you
check the arm for proper action and full gate travel
before fully welding the parts together.
REMOVE THE
GATE ARM BEFORE WELDING!
Apply Krylon

®

metallic

gold spray paint or equivalent to touch up welds when
fi nished.

Figure 7. Setting Gate Arm Lengths

A

B

C

SET LENGTH
AND WELD

SET LENGTH
AND WELD

CLAMP OR TACK WELD,

THEN TEST ARM ACTION

BEFORE FULLY WELDING

CAUTION!

36-1/2"

TYPICAL

22"

TYPICAL

LINK
ARM

CRANK

ARM

Figure 5. Gate Arm Harmonics

GOOD

HARMONICS

BAD

HARMONICS!

GATES SHOWN OPEN

GATE ARM FOLDS
OVER ITSELF

GATE WILL HAVE SOFT
STARTS AND STOPS

CRANK END OF
GATE ARM PARALLEL
TO OPEN GATE

GATE ARM JERKS AT START
AND WILL TRANSMIT FORCE
INTO GATE AND HARDWARE

Figure 6. Installing Gate Arm on Operator

CRANK END OF

GATE ARM

DISCONNECT

PIN

PULL

PIN

RAIN CAP

SHOLDER BOLT

ALIGN CRANK ARM ON OPERATOR
THEN TIGHTEN THESE TWO BOLTS

CAUTION

DO NOT WELD THE GATE ARM WHILE IT IS ATTACHED TO THE
OPERATOR! Connecting the welder’s ground to the operator’s
frame will cause the arc welding current to pass through the
operator parts, severely damaging or destroying the operator.

Advertising