Roof attachment installation – Lochinvar TISUN SCH-I-O User Manual

Page 27

Advertising
background image

SCH Collectors Installation & Operation Manual

27

Figure 3-38 Pre-Drill 10 mm Hole & Attach to Concrete

min. 2 1/4”

min. 3”

22 ft./lbs.

USE THE WASHER AND NUT

TO SECURE THE ANCHOR BOLT

TO THE CONCRETE

6. Place the second nut and washer on the anchor bolt at the
desired height (if using the anchor bolt with
adjustments).

7.

Drill a 10.5 mm hole in the horizontal bar (see

FIG.

3-39).

8. Place the horizontal bar onto the anchor bolt and use the

remaining washer and nut to secure the horizontal bar to

the substructure as shown in FIG. 3-39.

Figure 3-39 Attach Horizontal Bar

ATTACH HORIZONTAL BAR

DRILL 10 MM HOLE

22 ft./lbs.

2 1/4”

3”

DRILL 10.5 MM HOLE

HORIZONTAL BAR

INSTALLED ON ANCHOR BOLT

3

Roof Attachment Installation

(continued)

SCH Collectors Installation & Operation Manual

Advertising