Assembly instructions – Landice 72070 User Manual

Page 7

Advertising
background image

2

Assembly Instructions

• On L7 treadmills it is necessary

to remove the bolts which hold
the treadmill to the pallet.

• Start by removing the top bolts.
• Lay the treadmill on the ground,

and then remove the bottom
bolts by placing the treadmill on
your toolbox.

• With the bolts removed, the

treadmill will be free to move
around in the box.

• Remove the metal strapping

around the box.

• Using a razor blade knife, cut the

box just above the bottom row
of brass staples along all sides
of the box.

• DO NOT cut through the

center of the box, as you could
damage the treadmill.

• Remove the box and discard.

• The treadmill components

are held together with plastic
strapping.

• Carefully cut and remove the

strapping. Remove the treadmill
upright and accessory boxes
from the treadmill. Lift the
treadmill off the pallet.

• Carefully remove the upright

side cover from the upright
assembly.

• Slide the upright down onto the

8-side frame bolts.

• Tighten bolts with a 7/16”

extended socket.

• The handrail mounting bolts

have been threaded into the rails
for shipping. Remove them.

• Attach both handrails by first

hand-starting the bolts through
the upright and then using a
1/2” socket. Leave about 1/8”
of slack.

(DO NOT TIGHTEN FLUSH TO
SURFACE).

• After mounting both handrails,

gently lower the curved crossbar
into position between them.

• Each end of the crossbar

should cover the two smaller
access holes that are cut into
the handrails.

• Leave contact heart rate

connection harness hanging
for now.

STEP 1:
Unbolt treadmill from pallet

STEP 2:
Cut the box off the pallet

STEP 3:
Unstrap the treadmill

STEP 4:
Secure upright to frame

STEP 5: Prepare to install hand
rails (Med Rails: the word
handrails
refers to the 4”
clamps for steps 5-8)

STEP 6:
Place crossbar

• Using an extended 1/2” socket,

carefully guide the 2 inch bolt
with lock washer into the big
access hole in the side of the
handrail.

• Once the bolt reaches the

crossbar, tighten it.

• Repeat this step with the other

handrail.

STEP 7:
Secure crossbar

• Press the dome plugs into the

large access holes on the side of
the handrails.

• Finish tightening the handrail

bolts from STEP 5.

• Note: Med Rails go to Appendix

A on page 30.

STEP 8:
Secure hand rail

Advertising