Test and checkout procedures, and trouble shooting – LG MV1825SW User Manual

Page 26

Advertising
background image

7-15

- CAUTIONS -

- DISCONNECT THE POWER SUPPLY CORD

FROM THE WALL OUTLET WHENEVER
REMOVINGING THE CABINET FROM THE UNIT.
PROCEED WITH THE TESTS ONLY AFTER
DISCHARGING THE HIGH VOLTAGE CAPACITOR
AND REMOVING THE WIRE LEADS FROM THE
PRIMARY WINDING OF THE HIGH VOLTAGE
TRANSFORMER. (SEE FIGURE 24)

- ALL OPERATIONAL CHECKS WITH MICROWAVE

ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.

A. TEST PROCEDURES

COMPONENTS

TEST PROCEDURES

RESULTS

MAGNETRON

(Wire leads are

removed)

HIGH-VOLTAGE

TRANSFORMER

(Wire leads are

removed)

1) Measure the resistance: Across the

filament terminals of the magnetron
with an ohm-meter on Rx1 scale.

2) Measure the resistance: Between

each filament terminal of the
magnetron and the chassis ground
with an ohm-mater on high test scale.

1) Measure the resistance:

With an ohm-meter on Rx1 scale.
a. Primary winding;
b. Filament winding;
c. Secondary winding;

2) Measure the resistance:

With an ohm-meter on highest scale.

a. Primary winding to ground;
b. Filament winding to ground;

Normal reading:

Less than 1 ohm.

Normal reading:

Infinite ohms.

NOTE: Replace the magnetron, if the
magnetron checks and all of the
high voltage component tests are
good, but the unit still does not heat
a load.

Normal readings:

Approx. 0.2 to 0.5 ohm.
Less than 0.1 ohm.
Approx. 50 to 120 ohms.

Normal readings:

Infinite ohms.
Infinite ohms.

NOTE: A MICROWAVE ENERGY LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS

SERVICED FOR ANY REASON.

Primary
Winding

Secondary
Winding

Filament
Winding

Figure 24

TEST AND CHECKOUT PROCEDURES, AND TROUBLE SHOOTING

Advertising
This manual is related to the following products: