Rack-mount, Support base, Rack-mount conversion diagrams – Liebert GXT User Manual

Page 6

Advertising
background image

6

Support
Base

Rack-Tower models are stabilized by the supplied support bases.

See illustration for placement.

RACK-MOUNT CONVERSION DIAGRAMS

Top
Cover
Screws

Flange

Screws

Aerial View

w/top cover removed

Rubber

Feet

Lift here to
change
orientation of
display template

!

+

-

E

D

C

B

A

Fault

BYPASS

UPS

ON

BATTERY

AC

I N P U T

RACK-MOUNT UPS CONVERSION AND INSTALLATION

1. Unpack the UPS carefully noting the packing method. Retain the box and

packing material for possible future shipment.

2. CAUTION: The UPS is heavy (see specifications). Take proper precautions

when lifting or moving it.

3. Visually inspect the UPS for freight damage. Report damage to the carrier

and your dealer.

4. Remove the two screws located at the rear of the top cover with a Phillips

(cross head) screw driver. Push the top cover towards back of UPS and lift
off. Remove and retain the two flange screws located at the front of UPS.

Advertising