Powerware 9355 User Manual
Page 38
Advertising

INSTALLING OPTIONS
EATON Powerware
®
9355 Parallel UPS (10/15 kVA) User’s Guide
S 164201601 Rev A www.powerware.com
32
7.
Reinstall the front covers, starting with the bottom cabinet (see
Figure 26).
Hang the top edge of the cover on the cabinet first, then lower the
bottom edge and snap into place. Be sure the cables fit in the
access holes in the covers.
Figure 26. Reinstalling the Front Covers
8.
Continue to “Stabilizing the Cabinet” on page 33 to complete the
parallel UPS installation.
Advertising