Grounding diagram and procedure – Paradyne 4300 User Manual
Page 15
Advertising

4300 Remote Broadband Access Concentrator Installation Instructions
GROUNDING DIAGRAM AND PROCEDURE
Internal Grounding bus
Ground Rods
Front view of cabinet with
door open
Figure H - Grounding Diagram
To ground the cabinet, see Figure H above.
1. Drive the ground rods into the ground near the cabinet location.
2. Use a Megger-type ohmmeter to measure the resistance between cabinet ground and the ground rod. The
resistance must be 25 ohms or less.
3. If the resistance requirement in Step 2 is met, proceed to step 4. Otherwise, follow local practices to lower
the resistance to ground.
4. Connect a #6 ground wire to the ground rod.
4300-A2-GZ40-00 July 2004 15
Advertising