English, Compact 2, 11 operation – Protec Protech Compact2 Film Processor SX 2 User Manual

Page 11

Advertising
background image

COMPACT 2

TM

11

Operation

English

®

Before use...

1.

Close water-drainage stop cock.

2.

Open water tap.

3.

Switch processor on.

4.

Check liquid level in replenishment and drainage collecting containers.

5.

Wait until the start-cycle has been completed or until Developer temperature
is reached.

6.

Run cleaning films through processor.

Working procedure

7.

Processing films:Open light protection cover, insert film on side of infeed tray
and feed in, during infeed please watch the Infeeding-film-display “– –”.

After work...

8.

Switch processor off.

9.

Close water tap.

10. Open water drainage stop cock

Stand-by mode:

When no film is being processed, the machine switches to Stand-by. The chemicals
remain at a constant temperature. The film transport and water inflow activate at in-
tervals to avoid crystalisation of the chemicals on the transport rollers. Entry of the
next film is possible at any time.

Attention:

Upon first operation and each refilling of a developer check
the function of the circulation pump and vent the pump if re-
quired (see page 8).

Film exit at rear of machine optional with
“Through the wall mounting film output” kit.

Do not place any object
on the processor.

Drying

Washing

Fixing

Intermediate rinsing

Fresh water inflow

Film exit

Replenishment fixer

Advertising