Assembly – Powermatic 2013 User Manual
Page 10
 
10
Assembly
Tools required for assembly:
Forklift or hoist with straps 
10-12mm wrench (provided) 
14mm wrench 
(NOTE: A socket wrench set may speed 
assembly time) 
 
Remove all crating and plastic from around the 
band saw. Remove any lag screws or holding 
straps which secure the band saw to the wood 
pallet. 
Use a hoist or forklift with straps to lift the band 
saw from the pallet. (Do NOT place forks or 
straps directly under the band saw table to lift it.) 
Move the band saw to its permanent location, 
which should be dry and well lit, with enough 
space on all sides to handle long stock or 
perform routine maintenance on the machine. 
Make sure the floor is able to support the weight 
of the machine. 
Areas of the Band Saw have been given a 
protective coating at the factory. This should be 
removed with a soft cloth moistened with 
kerosene or mineral spirits. Do not get solvents 
near plastic or rubber parts, and do not use an 
abrasive pad as it may scratch metal surfaces. 
Installing Fence and Rails
1. Mount the front rail (A, Figure 1) to the saw
table with two 5/16 x 1-1/4 hex cap screws, 
two 5/16 lock washers, and two 5/16 flat 
washers. Screws should be placed 
horizontally in approximately the center of 
the slot. Hand tighten the screws. 
2. Mount the rear rail (B, Figure 1) to the table
with two 1/4 x 5/8 hex cap screws, two 1/4 
lock washers, and two 1/4 flat washers. 
Hand tighten the screws. 
3. Push the front and rear rails upward (toward
the table top) as far as they will go.
4. Tighten the two hex cap screws holding the
front rail to the table, with a 12mm wrench. 
Tighten the two hex cap screws holding the 
rear rail to the table with a 10mm wrench. 
5. Attach the guide rail (C, Figure 1) to the
front rail with five 1/4 x 5/8 hex cap screws, 
five 1/4 lock washers, and five 1/4 flat 
washers. The scale on the guide rail should 
face toward the operator. Hand tighten the 
screws only. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 1