Exploded view, Hose replacement, Power cord/on-off switch replacement (cont.) – Panasonic MC-V5203 User Manual

Page 6: Body, motor housing, and motor)… block c, Removal, Replacement, Installation

Advertising
background image

- 6 -

- 15 -

C-3

C-6

C-8

C-7

C-10

C-1

C-2

C-9

C-40

C-41

C-42 C-39

C-36

C-22

C-35

C-28

C-12

C-11

C-15

C-23

C-14

C-29

C-30

C-13

C-21

C-24

C-16

C-15 C-13

C-49

C-48

C-50

C-17

C-47

C-5

C-16

C-46

Tabs

C-51

C-52

C-20

C-25

C-34

C-31

C-27

C-19

C-43

C-26

C-4

C-38

C-45

C-44

C-33

C-37

C-18

C-32

C-53

C-54

EXPLODED VIEW

(BODY, MOTOR HOUSING, AND MOTOR)… BLOCK

C

Removal

1. Remove the dust cover and dust bag.

2. Remove the end of the hose from the wand. Remove the hose by removing the two screws which secure it to the dust container.

Replacement

1. Install the new hose by replacing the two screws which secure it to the dust container.

2. Replace the hose onto the wand.

3. Replace the dust bag and dust cover.

HOSE REPLACEMENT

Installation

1. Insert the new power cord (power cord replacement only) into the dust compartment as far as necessary in order to place a new cord
retainer in proper location on power cord. The proper location is approximately one and one eighth inches/thirty millimeters (1 1/8”/30
mm) of new power cord yellow outer jacket extending past the cord retainer and washer. The washer goes between the cord retainer and
the dust compartment. Attach wires with wire connectors according to the wiring diagram in the front of this manual. ONLY USE A NEW
CORD RETAINER, DO NOT REUSE A CORD RETAINER.

2. For switch replacement only, insert the new ON/OFF switch with the numbers 1,2,3, facing toward you, into the dust compartment
until secured by the retaining tabs. Use a wire tie with the part number listed in the C Block parts list and place it in the location shown in
(Fig. 15) taking care not to overtighten it. Tuck the wire connectors back into the dust compartment as shown in the close-up view in (Fig. 15).

3. Ensure that the Insulator Packing is installed correctly, (see Fig. 16).

4. Replace the switch cover, the two (2) switch cover screws, and the dust cover. Care should be taken not to pinch wires and make sure
that the switch cover goes on easily and stays flat. If there is resistance to the switch cover lying flat and in place, stop, remove the cover
and make sure that no wires are being pinched. DO NOT USE A POWER SCREWDRIVER TO SECURE THE COVER.

NOTE: Any service involving the handle or switch cover area should be followed up with a dielectric or current leakage check
of the unit. If you do not have the equipment or are not familiar with the test procedures, take the unit to an authorized servicer.

POWER CORD/ON-OFF SWITCH REPLACEMENT (Cont.)

Advertising