Figure 9, Figure 10 – ParaBody 441101 440 User Manual

Page 7

Advertising
background image

7

STEP 9

Install the NEW 110-3/4” CABLE ASSY (16) using the following steps:

• Route the CABLE (16) back over one pulley in the TOP BOOM, down through the PULLEY BRACKET (2) and over the second

pulley in the TOP BOOM.

• Route the CABLE (16) around the PULLEY BLOCK as shown in FIGURE 9.

• Route the CABLE (16) through the TOP BOOM as shown in FIGURE 9. The pulleys in TOP BOOM may need to be temporarily

removed to perform this step. (Note: Make sure the CABLE is running OVER the BOLTS connecting the FRONT UPRIGHT
to the TOP BOOM. These may also have to be removed to perform this step.)

FIGURE 9

2

16

FIGURE 10

3/8 X 1-3/4” 13

16

11

2

STEP 10

• Loop CABLE (16) around one 3-1/2” PULLEY (5) in the PULLEY

BRACKET (2) using one 3/8 X 1-3/4” BOLT (13) and one 3/8”
LOCKNUT (11) as shown in FIGURE 10.

5

• Screw the threaded end of CABLE (16) into the HEAD PLATE

ASSEMBLY.

IMPORTANT: Cable must run over the top of
bolts.

Advertising