Installing the power center – Pentair C40 User Manual

Page 8

Advertising
background image

3

IntelliChlor Power Center Installation Guide

Installing the Power Center

Install the Power Center at eye level as close to the IntelliChlor pump and filtration as possible.

CAUTION:

The Power Center must be installed more than 8 ft. (2.44 m) from the pool edges.

Leave sufficient clearance on all sides of the Power Center. Ensure that the 15 ft. (4.61 m) DC power cord
from the Cell assembly pipe location can reach the Power Center location. The Power Center enclosure can
be mounted on the wall up to 15 feet away from the cell controller.

Note: For installation instructions about connecting the cell to Power Center, see the “IntelliChlor
User’s Guide” (P/N 520589).

Mount the Power Center enclosure:

1. Remove the screw securing the Power Center cover and remove the cover.

2. Mount the Power Center on a flat surface such as a wall or post and mark each mounting bracket

screw hole location. There are two (2) screw holes and a keyslot for the top and lower bracket.

3. Drill six ¼ inch (6.35 mm) holes. Install anchors if necessary and one screw for each bracket keyslot

location.

4. Position each Power Center keyslot (top and lower) slot over the two mounting screws just installed.

Tighten the two screws to secure the enclosure.

5. Install and tighten four mounting screws (two in the top and two in the lower bracket).

Bracket keyslot

Bracket screw hole

Bracket screw hole

Bracket screw hole

Bracket screw hole

Bracket keyslot

Cover screw hole

Advertising
This manual is related to the following products:

C20