Chapter3 installation, Package contents, Chapter 3 installation – Nortel Networks 60-12T User Manual

Page 27: Package contents -1

Advertising
background image

206378-A

3-1

Chapter 3

Installation

You can stack the BayStack 60-12T/60-24T 10/100 Ethernet Hubs on a flat
surface, or mount them in a standard 19” equipment rack. This chapter explains
how to mount or stack your hubs, how to connect and power up the hub, and how
to troubleshoot hub operations. Before installing the hub, be sure your
environment meets the requirements defined in

“Hardware and Environmental

Requirements

” on

page 1-6

.

Package Contents

The contents of your product package should contain the following items:

One of the following BayStack 60 Series Hubs:

— BayStack 60-12T 10/100 Ethernet Hub (12 port 10/100 Mb/s hub)

— BayStack 60-24T 10/100 Ethernet Hub (24 port 10/100 Mb/s hub)

One mounting kit, including brackets and screws, for mounting the hub in a
standard 19” equipment rack

Appropriate power cord

Advertising
This manual is related to the following products: