Caution, Tfp connected to heat recovery ventilator, Type 2 installation – Lifebreath TFP3000 User Manual

Page 3

Advertising
background image

TFP Connected to Heat Recovery Ventilator

LOCATION

The TFP should be located in the main trunk of
the fresh air to house line, after the Heat
Recovery Ventilator (HRV) and before any branch
lines. (Fig. 3)

MOUNTING

1. Locate mounting bolts (4) on side of TFP cabinet

for vertical hanging (Fig. 3) and remove.

2. Measure distance between the bolts and mark it

on the floor/header joist where the TFP is to be hung.

3. Fasten hanging straps to floor joists using wide

head nails or screws with washers.

4. Insert hanging bolts through prepunched holes in

straps and lift TFP into position. Tighten and secure bolts.

DUCTING

1. Install (2) 7” port collars (provided) on TFP

cabinet with (8) 8/32” X 3/8” sheet metal screws
provided (Fig. 3).

2.

The ducting between the TFP and the HRV,
and between the TFP and the main supply
trunk line to the house, should be kept as
straight as possible.

3.

A relief opening or breathing T is required to
prevent pressure differences.

4.

A short piece (1-2 foot) of flexible ducting should
be used on both sides of the TFP (Fig. 3).
This will reduce vibration and noise transfer
if present.

NOTE: Please refer to the HRV installation manual
for proper ducting of that appliance.

Type 2 Installation
* “Breathing T” is designed to assist in neutralizing

pressure differences which can occur between HRV
and TFP when joined together.

TFP

Hanging straps (4)

Relief opening

(breathing T)

or leave a 4" - 6"

gap between the

TFP and the HRV

7" port collars

Access door

Power cord

Flexible ducting

(fresh air supply)

Air flow

HRV

To BRANCH LINES

Mounting bolts

Main supply trunk

Flexible ducting

TFP air cleaner

FLOOR JOISTS

3

TYPE 2 INSTALLATION

Figure 3

The room in which the breathing T is open
should be free of combustion equipment such
as gas hot water tanks and furnaces. If the T
must be exposed in these areas, a pressure test
(spillage or backdraft test)should be conducted
on the combustion equipment after everything is
installed.

CAUTION

Advertising
This manual is related to the following products: