NEC LT81 User Manual
Page 38
Advertising
2. Remove the screw from the board cover.
3. Put the board in place and secure it with the four screws supplied
with the VK-LT board.
4. Attach the two foot caps to adjust projector height. After complet-
ing, put the projector back in the original position.
73
OPERATION
74
Mounting the Optional LT100 Viewer Board (VK-LT)
Before mounting the viewer board, you must first switch off the
main power and unplug the power cable.
To install the VK-LT Viewer board:
1. Turn the projector so that the bottom is up.
Advertising