Performing the upgrade, Performing a readiness check, Chapter 4 performing the upgrade – NEC 320Fc User Manual

Page 71

Advertising
background image

Performing the Upgrade

4-1

Chapter 4

Performing the Upgrade

4-

Performing the Active Upgrade process can involve the following tasks:

•

Performing a readiness check

•

Splitting the system

•

Merging the System

•

Committing the upgrade

•

Aborting the upgrade (if necessary)

•

Finishing the upgrade

•

Viewing Active Upgrade process status

Performing a Readiness Check

Before you can initiate split mode on a system, the system must pass a readiness
check. The readiness check verifies that your system meets the prerequisites for the
Active Upgrade process. For example, the readiness check ensures that:

•

The system is currently running in duplex mode.

•

The disks you selected as system disks are present and are mirrored with RDR.

•

The system contains two properly configured VTM adapters.

•

The embedded Ethernet PCI adapters in your system are configured into Ethernet
teams, and each team contains at least one adapter from each physical enclosure.

•

The application services you specified for control are currently running, and can be
stopped when necessary.

•

The executable file for any custom action is present on the system and ready to run.

To perform a readiness test, do one of the following:

•

Click Next on the Upgrade Summary page (if you are using a configuration file).

•

Click Active Upgrade on the navigation bar (the readiness test starts automatically
if you have recently opened or changed your configuration).

•

Click Retry on the Active Upgrade page.

Advertising