Installation checklist, F. wiring – Ruud PowerVent 2 AP13370-2 User Manual

Page 18

Advertising
background image

18

Installation Checklist

A. Water Heater Location

B. Water Supply

C. Gas Supply

D. Relief Valve

E. Venting

❑

Close to area of vent termination.

❑

Indoors and protected from freezing
temperatures.

❑

Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.

❑

Sufficient fresh air supply for proper
operation of water heater.

❑

Air supply free of corrosive elements and
flammable vapors.

❑

Provisions made to protect area from water
damage.

❑

Sufficient room to service heater.

❑

Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base
of the heater.

❑

Clearances of 1” (2.54cm) from combustion
air inlet openings observed.

❑

Water heater completely filled with water.

❑

Air purged from water heater and piping.

❑

Water connections tight and free of leaks.

❑

Gas line equipped with shut-off valve, union
and sediment trap.

❑

Approved pipe joint compound used.

❑

Soap and water solution used to check all
connections and fittings for possible gas leak.

❑

Gas Company inspected installation (if
required).

❑

Temperature and Pressure Relief Valve
properly installed and discharge line run to
open drain.

❑

Discharge line protected from freezing.

❑

Vent length verified.

❑

Heater vented separately from all other
appliances.

❑

Proper materials and techniques used in vent
assembly.

❑

Vent pipe properly secured to blower
housing.

❑

Vent termination/screen installed.

❑

Vent pipe supported at required intervals.

❑

Appropriate minimum clearance observed.

❑

Precautions taken to prevent moisture
damage around vent termination.

F. Wiring

❑

Correct power supply (120V) 50/60 Hz.

❑

Electrical Connections tight.

❑

Heater properly ground and proper polarity
observed.

Advertising