Installation check list – Rheem AP13945-2 User Manual

Page 25

Advertising
background image

25

A. Water Heater Location

❑

Close to area of vent termination.

❑

Indoors and protected from freezing temperatures .

❑

Proper clearance from combustible surfaces
observed.

❑

Sufficient fresh air supply for proper operation of
water heater.

❑

Air supply free of corrosive elements and
flammable vapors.

❑

Provisions made to protect area from water
damage.

❑

Sufficient room to service heater.

❑

Combustible materials, such as clothing, cleaning
materials, rags, etc. clear of the heater and vent
piping.

❑

Water heater is properly attached to the wall.

B. Water Supply

❑

Water supply has sufficient pressure.

❑

Air purged from water heater and piping.

❑

Water connections tight and free of leaks

❑

Water filter is clean and in place.

❑

Materials used are as instructed in this manual.

❑

Water pipes are insulated and protected from

freezing.

C. Gas Supply

❑

Gas type matches rating plate.

❑

Gas supply pressure is sufficient for the water
heater.

❑

Gas line equipped with shut-off valve, union and
sediment trap.

❑

Approved pipe joint compound used.

❑

Soap and water solution used to check all
connections and fittings for possible gas leak.

❑

Gas Company inspected installation (if required).

D. Relief Valve

❑

Pressure Relief Valve properly installed and
discharge line run to open drain

❑

Discharge line protected from freezing.

E. Venting

❑

Vent pipe material should be category III and meet

UL1738 in US and ULC.636 in Canada.

❑

Vent connector(s) pitched downward to termination
(¼" per foot of length minimum) See page 14.

❑

Vent connector(s) securely fastened together with
high temperature silicone (500°F) (260°C) and air-
tight.

❑

All vent runs are properly supported.

❑

Vent terminal is properly installed.

❑

Sufficient combustion air is available.

❑

Maximum and minimum vent lengths are
observed.

F. Electrical Wiring

❑

Voltage matches rating plate.

❑

Water heater is properly grounded.

❑

Supply cord and/or wiring meets all local codes.

G.

❑

❑

Air Intake Pipe

❑

Connected to the air intake tee/vent termination
and heater.

❑

All vent runs are properly supported.

❑

Maximum and minimum vent lengths are
observed.

❑

Connected securely together and airtight.

Installation Check List