Renaissance Group RB5C7748RR User Manual

Page 8

Advertising
background image

8

R

888 Porter Rd. Muskegon, MI 49441 Phone: 231.798.8888 Fax: 231.798.4960 www.structuralconcepts.com

ELECTRICAL FUNDAMENTALS

Warning, disconnect power before providing
maintenance and service to unit.

Ballast Access/Removal

Assembly or disassembly and servicing
to be accomplished by licensed electrical
contractor.

Remove the rear grill by removing the six
screws located on both sides of the grill.

Remove the control panel by removing the
three remaining screws located on the right
side of the panel.

Release quick disconnect from wire har-
ness.

Remove two nuts from both end mounting
flanges.


Electrical Box Access/Removal

Assembly or disassembly and servicing
to be accomplished by licensed electrical
contractor.

Remove the rear grill by removing the six
screws located on both sides of the grill.

Remove the control panel by removing the
three remaining screws located on the right
side of the panel.

Remove the electrical box by removing the
four screws located inside and at the top of
the box.


Evaporator Pan Access/Removal

Assembly or disassembly and servicing
to be accomplished by licensed electrical
contractor.

Turn off main power and allow evaporator
pan to cool.

Remove the rear grill by removing the six
screws located on both sides of the grill.

Check temperature of pan prior to han-
dling.

Withdraw evaporator pan from the right side
behind electrical box.

Disconnect evaporator pan power cord from
receptacle at the pan.

Empty evaporator pan contents into a suit-
able container.

Rear Grill

Elect. Box Screws

Ballast

Control Panel

Evaporator Pan

Advertising
This manual is related to the following products: