Driveline length check procedure -5, Operation opera tion – Rhino Mounts FM100 User Manual

Page 79

Advertising
background image

Operation Section 4-5

FM100 02/04
© 2004 Alamo Group Inc.

OPERATION

OPERA

TION

Driveline in maximum compressed position

1/8 INCH

COLORED TAPE

FIGURE 2

BEFORE OPERATING OR TRANSPORTING THIS MOWER

Always display this SMV emblem (FIGURE1) on the rear of the tractor transporting this mower where it is
clearly visible to oncoming traffic. Prominent display of this symbol will help the operator avoid accidents
which could cause injury or possibly death.

FIGURE 1

DRIVELINE LENGTH CHECK PROCEDURE

WARNING!

A loose shaft could slip off and result in personal injury or damage to cutter. When
attaching PTO yoke to tractor PTO shaft, it is important that spring activated locking collar
slides freely and locking balls are seated in groove on PTO shaft.

WARNING!

Before operating cutter, check to make sure the driveline will not bottom out or become
disengaged.

* Disengage the Driveline from the tractor PTO Shaft.
* Slide the Driveline together until it "bottoms out" solidly.
* Apply colored tape to the Inner Shield 1/8" from the end of the Outer Shield. FIGURE 2
* Re-attach the Driveline to the PTO Shaft.

Advertising