A-frame installation, Tail wheel installation, Tighten all bolts to the proper torque – Rhino Mounts SE42 User Manual

Page 81: A-frame installation -3 tail wheel installation -3, Assembly, Assembl y

Advertising
background image

ASSEMBLY

SE42 03/08

Assembly Section 3-3

© 2008 Alamo Group Inc.

ASSEMBL

Y

A-FRAME INSTALLATION

(AsmP-R-0017)
1.

Attach “A” Frames (1) to inside of welded hitch
brackets on Mainframe, insert Hitch Pin (12),
Bushing (15), flatwasher (11), lockwasher (14)
and install nut (13). Then attach to lug hitch with
bolt (22) and locknut (23).

2.

Install the lift straps (3) on inside of top rails on
mainshield (behind gearbox mount) and attach
with 1/2” x 1-1/2” bolts (10) and locknuts (9).

3.

Insert spacer (7) between A- frames (1). Insert
3/4” x 6" bolts (8) thru hole in lift straps and
spacer (7). Secure with 3/4” locknut (9).

TAIL WHEEL INSTALLATION

(AsmP-R-0018)

1. Align tailwheel beam weldment (16) between pivot brackets located behind gearbox mount on mainshield

weldment. NOTE: Long side of caster fork pivot tube is positioned up. Attach tailwheel beam weldment to
mainshield with 5/8” x 3-1/2” bolt (5) and locknut (6).

2. Insert caster fork assembly (19) into tailwheel beam weldment (16). Install washer (17) and secure with

cotter pin (18).

3. Place tailwheel adjusting brackets on to deck and secure with bolt (20) and locknut (21).

4. Position tailwheel beam weldment between tailwheel adjusting brackets on mainshield weldment and

secure with two 1/2” x 3" bolts (8) and locknut (9).

5. Tighten all bolts to the proper torque.

Advertising