Operation, Opera t ion – Rhino Mounts 2408 User Manual

Page 60

Advertising
background image

OPERATION

2408 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

OPERA

T

ION

LOADER BOOM ASSEMBLY

•

Inspect condition of each arm section weldment

•

Ensure all pins are in place.

•

Ensure all bolts and screws are properly
installed.

•

Check condition of bushings at boom pivot
points.

•

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-L-0005_B

HYDRAULIC LINE INSPECTION

•

Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.

•

Inspect the condition of the valve weldment.

•

Ensure fitting is properly connected

•

Inspect condition of bushings. OPS-L-0018_B

Hydraulic Hoses

BUCKET INSPECTION

•

Ensure all pins are in place.

•

Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.

•

Inspect the condition of the bucket lug
weldments.

•

Inspect condition of bushings.

OPS-L-0007_B

Bucket Pins

Advertising