Ramsey Electronics HR20 User Manual

Page 14

Advertising
background image

HR20

• 14

INITIAL TESTING OF YOUR HR20:

You’re now ready to power up and test your HR20, but before you begin take
some time to sweep off your bench of any loose component leads or solder
splashes. A clean work area not only makes testing less frustrating but also
less prone to problems.

REQUIRED FOR INITIAL TESTING AND ALIGNMENT:

A known frequency standard in the 10MHz range such as:

Crystal oscillator or,

RF signal generator or,

Grid Dip oscillator or,

QRP transmitter such as a Ramsey QRP-20

A Ramsey frequency counter, CT-90 or,

Any accurately calibrated receiver covering 20 meters

At the least,personal familiarity with the 20 Meter Ham band

And the following:

Coil alignment tool ( can be homemade per directions) and

9-volt battery, antenna earphones or a small speaker.

Connect the following:
‰

Fresh, 9-volt battery.

‰

Earphone or speaker.

Antenna or at least a random length of wire.

‰

Adjust the three controls to the middle of their ranges.

‰

Press the power switch “on”. You should hear background noise
immediately, at least a gentle hiss.

‰

See if the volume control works, vary it and notice how the volume
changes.

‰

See if the RF gain control has some effect on what you hear.

‰

If everything seems ok so far, feel the tops of the two IC's with your finger.
Neither should feel hot or warm

‰

Slowly rotate the tuning control. At this point you may or may not hear
anything, since neither coil has been adjusted. If you do hear a few
whistles as you tune, the SA602 oscillator is working just fine.

‰

These simple initial checks verify that your receiver is operating well
enough to proceed to the next section, alignment.

Advertising