SECTION O: ADB INITIAL START-UP

1.0

TOOLS NEEDED

•

One 8-0-8 , 16” scale manometer (or larger)

•

Three 4-0-4, 8” scale manometers (or larger)

•

“T” fitting

•

7/16” and 1/2" open end wrenches

•

Small and large flat-head screwdrivers

•

Volt meter

•

Amp probe

•

Elec. Dual reading thermometer with strap on sensors

•

3/16” Allen wrench

•

Remote switch with 12" minimum lead wires (“Monkey” switch)

•

Combustion analyzer

2.0

PREPARATION FOR START-UP

WARNING:

DO NOT TURN ON GAS AT THIS TIME

2.1

Check Power Supply

With volt meter at incoming power check voltage between:
Hot - Common

(

approx

120 VAC)

Hot - Ground

(

approx

120 VAC)

Common - Ground

(< 1 VAC)

If Common - Ground is > 1 VAC - STOP: Contact electrician to correct ground failure. Warning: Failure to do this
may burn out 120V-24V transformer, or may cause other safety control damage or failure.

2.2 Attach Manometers to Measure Pressures (See Figure: O-1)

•

Attach 16" scale manometer to the first main gas shut-off valve pressure tapping, Location (1)

•

Attach one 8" scale manometer to the outlet side of the second main gas shut-off valve pressure tapping, Location
(2).

•

Attach one 8" scale manometer to the outlet side of pilot gas valve pressure tapping, Location (3).

•

Attach one 8" manometer to "T" fitting, air pressure switch, and aluminum tubing, Location (4).

Turn Off Main Gas Valve;
Turn Off Pilot Gas Valve;
Reset Low Gas Pressure Cut-off Switch;

2.3 Bleed Air from Gas Line

CAUTION: Make sure there is no ignition source in the boiler room

•

With power off, slightly open union outside the cabinet to bleed air.

•

Close union when you smell gas.

•

Wait minimum 5 minutes to clear the gas out of the boiler room before continuing.