6 condensate drain assembly – Roberts Gorden Vacuum Assisted Linear User Manual
Page 46
Advertising

B
LACKHEAT
®
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
40 of 74
Step 9.6 Condensate Drain Assembly
Tee
Condensate Cap
Wall
1" BSP threaded hole.
Use 1" x ¾" reducer.
(not supplied)
Must be connected
to a drain system
in accordance with
local codes.
3/4" CPVC Pipe
Flow
Non-Return
Valve
3/4" CPVC
Pipe
3/4" Female
Fan
Advertising
This manual is related to the following products:
- Double Linear U-Tube and Multi-Burner Gas Fired Heating Systems BH15ST BH20ST and Multi-Burner Gas Fired Heating Systems BH45UT/EF and Multi-Burner Gas Fired Heating Systems BH70DL/EF and Multi-Burner Gas Fired Heating Systems BH25ST/EF and Multi-Burner Gas Fired Heating Systems BH45ST/EF and Multi-Burner Gas Fired Heating Systems BH25UT/EF and Multi-Burner Gas Fired Heating Systems BH50UT/EF and Multi-Burner Gas Fired Heating Systems BH40ST/EF and Multi-Burner Gas Fired Heating Systems BH40DL and Multi-Burner Gas Fired Heating Systems BH60DL/EF and Multi-Burner Gas Fired Heating Systems BH30DL and Multi-Burner Gas Fired Heating Systems BH40UT/EF and Multi-Burner Gas Fired Heating Systems BH15UT and Multi-Burner Gas Fired Heating Systems BH30ST/EF and Multi-Burner Gas Fired Heating Systems BH50ST/EF BH55ST and Multi-Burner Gas Fired Heating Systems BH35ST/EF