Rebuild – Rolls-Royce 1004227 User Manual

Page 58

Advertising
background image

EPRI Proprietary Licensed Material


RB 211 Maintenance Scope

B-6

Rebuild the Module to the Rolls-Royce overhaul specification, fits and clearances etc. and ship
back to the Customer or replace in the ‘POOL’.

05 Module:

• Carry out dimension check of IPT Rotor setting.
• Inspect the IP Turbine Casing Assembly in the Bulk Condition, including Seal Segments, IP

NGV’s, HP and IP Roller Bearings and Static Abradable Seals.

• Inspect the IP Turbine Rotor Assembly in the Bulk condition. Check wear on IP
• Turbine blade ‘Z’ notch, turbine disc, shaft, coupling and IPT bearing.
• Insure no ‘coking’ in oil scavenge or vent lines in the ‘spider’.
• Carry out the following Repair Notes and Overhaul Information Alerts:

− RN5018

HP/IP support internal pipe inspection/test

− RN5037

IP Turbine Blade inspection criteria

• Embody the following modifications:

− Mod 1123 Revised vent connection, if required

06 Module:

• Visually Inspect all accessories, including Air and Oil Piping, Nose Bullet and P2 Air Filter.
• Electrically check Thermocouple Harness.
• Remove HP and IP Bleed Valves and Overhaul.
• Replace Seals in Davis Valve.

Rebuild

Using the Customers spare 04 Module, rebuild the engine to the Rolls-Royce Overhaul build
specification and fits/clearance limits.

Advertising