Page 16: Transition networks’ pocket switch, Installing on flat, stable surface

Advertising
background image

2. SITE CONSIDERATIONS

The site for the Transition Networks’ pocket switch must provide:

•

AC power outlet for each Transition Networks’ pocket switch

•

Adequate ventilation

•

Standard environmental conditions

•

Isolation from electrical noise, including radio transmitters and
broadband amplifiers, motors, high power electrical lines, or
fluorescent light fixtures.

Additionally:

•

The twisted pair cables should not run in the same conduit with
power line cables.

•

Phone lines should be separated from data cables.

•

Flat or “silver satin” wires should not be used.

And:

•

The entire installation should comply with the IEEE Ethernet
802.3 and the 802.3u specifications.

3. INSTALLATION

To install the Transition Networks’ pocket switch:

• Unpack Transition Networks’ pocket switch
• Install Transition Networks’ pocket switch on stable, flat

surface

• Set DIP switch
• Install network cable
•

Power Transition Networks’ pocket switch.

Direction is provided in the pages that follow.

Unpacking

the

Transition Networks’ Pocket Switch

The Transition Networks’ pocket switch packing contents should
include the following:

Item

Part Number

Transition Networks’

E-PSW-TX-02

Pocket Switch

OR
E-PSW-FX-02

Power Supply Adapter

3340, 3507, 3342, 3340, 3346, 3511,
OR 3537

/power cord: 3522

.

(depending upon power configuration
in country where installed)

User’s Guide

33015

Installing on Flat, Stable Surface

The Transition Networks’ pocket switch was designed and built to be
installed on a table or shelf.

Ensure that the installation location is:

•

stable

•

well- ventilated

•

near a standard AC electrical outlet.

Transition Networks’