Installation – United States Stove Company 6300C User Manual

Page 9

Advertising
background image

USSC

9

Installation

VENT TERMINATION CLEARANCES:

A -----

Minimum 4-foot clearance below or beside any door or window that opens.

B -----

Minimum 1-foot clearance above any door or window that opens.

C -----

Minimum 3-foot clearance from any adjacent building.

D -----

Minimum 7-foot clearance from any grade when adjacent to public walkways.

E -----

Minimum 2-foot clearance above any grass, plants, or other combustible materials.

F -----

Minimum 3-foot clearance from a forced air intake of any appliance.

G -----

Minimum 2-foot clearance below eaves or overhang.

H -----

Minimum 1-foot clearance horizontally from combustible wall.

I ------

Must be a minimum of 36-inches above the roof and 24-inches above the highest point of the roof within 10-feet.

VENT TERMINATION CLEARANCES

Advertising
This manual is related to the following products: