Brick installation – United States Stove Company 1800GC User Manual

Page 8

Advertising
background image

BRICK INSTALLATION

BRICK INSTALLATION

BRICK INSTALLATION

BRICK INSTALLATION

BRICK INSTALLATION

(PRE-INSTALLED AT FACTORY)

(PRE-INSTALLED AT FACTORY)

(PRE-INSTALLED AT FACTORY)

(PRE-INSTALLED AT FACTORY)

(PRE-INSTALLED AT FACTORY)

NOTE: Prior to operation, be sure to remove brick
retaining strips.

MODEL 1600 - (6) BRICKS ON EACH SIDE

MODEL 1600 - (6) BRICKS ON EACH SIDE

MODEL 1600 - (6) BRICKS ON EACH SIDE

MODEL 1600 - (6) BRICKS ON EACH SIDE

MODEL 1600 - (6) BRICKS ON EACH SIDE

FIREBOX LEFT SIDE

MODEL 1800 - (8) BRICKS ON EACH SIDE

MODEL 1800 - (8) BRICKS ON EACH SIDE

MODEL 1800 - (8) BRICKS ON EACH SIDE

MODEL 1800 - (8) BRICKS ON EACH SIDE

MODEL 1800 - (8) BRICKS ON EACH SIDE

BRICK RETAINING STRIP

FIREBOX LEFT SIDE

BRICK RETAINING STRIP

SLIDE 4th BRICK BACK
BEFORE INSTALLING 5th
AND 6th BRICK

FIREBOX:

The firebrick must be inserted on each side resting on the
grate frame. First, place cut brick in each back corner. Place
remaining brick in place.

SMOKE CHAMBER:

1. Place #1 firebrick in the back of smoke chamber.

2. Slide baffle plate into smoke chamber, flat side down.

3. Place remaining firebrick in smoke chamber as

numbered below. (in placing the firebrick in the smoke
chamber, lift the left side of firebrick first and drop into
place.) See Illustrations below.

REAR OF
FIREBOX

TOP

2

2

2

2

2

1

1

1

1

1

3

3

3

3

3

5

5

5

5

5

4

4

4

4

4

6

6

6

6

6

1/2 BRICK

MODEL 1600
(4

1

/

2

) BRICKS

MODEL 1800
(6) FULL BRICKS

7

7

7

7

7

1

1

1

1

1

3

3

3

3

3

4

4

4

4

4

5

5

5

5

5

6

6

6

6

6

2

2

2

2

2

8

Advertising