Viking 325E User Manual

Page 2

Advertising
background image

IMPORTANT–

Please Read and Follow!

3

Site Preparation

It is recommended that a thorough site inspection be
conducted PRIOR to unpacking and moving this appliance.

W A R N I N G

Make sure that incoming voltage is the

same as unit rating. An electric rating

plate specifying voltage, hertz, and amps

is attached to the product. Wiring the

dishwasher with more voltage than it is

rated for may cause severe damage. To

reduce the risk of fire, electric shock, or

injury to persons, installation work and

electrical wiring must be done by qualified

technician in accordance with all

applicable codes and standards, including

fire-rated conditions.

W A R N I N G

The dishwasher door may not stay open

by itself until the door panel is installed.

Be aware of this when fastening the

dishwasher to the cabinet.

W A R N I N G

Plumbing connections must comply with

applicable sanitary, safety and plumbing

codes.

W A R N I N G

Electrical power must be turned off at

circuit breaker or fuse box before making

electrical connections. Disconnect the

electrical power supply and place a tag at

the disconnect switch indicating that you

are working on the circuit.

• Before beginning–please read these

instructions completely and carefully.

• Do not remove permanently affixed labels,

warnings, or rating plates from the
dishwasher. This may void warranty or
create an unsafe product.

• Please observe all national and local

codes.

• Please ensure that this product is properly

grounded.

• The installer should leave these

instructions with the consumer who should
retain for local inspector’s use and for
future reference.

• The dishwasher has a factory installed

backflow preventer. Do not add an
additional check valve.

• Failure to provide a 20” above floor level

(50.8 cm) high loop may result in improper
operation of the dishwasher.

• Remove pallet screws from base. Damage

could occur to dishwasher if screws are not
removed.

Table of Contents

Warnings & Important Information ______________________________________ 3

Dimensions & Cutout Dimensions ______________________________________ 6

Specifications ________________________________________________________ 7

Custom Door Panel Specifications ______________________________________ 8

Custom Door Panel Installation Option _________________________________ 9

General Information _________________________________________________ 10

Site Preparation __________________________________________________ 10

Water Supply ____________________________________________________ 10

Drain____________________________________________________________ 10

Electrical Connections ____________________________________________ 11

Hardwire Conduit Option _____________________________________________ 12

Trim Installation Options _____________________________________________ 13

Counter Balance Spring Adjustment ___________________________________ 16

Installation Procedure_________________________________________________ 17

Performance Checklist _______________________________________________ 21

Testing for Leaks _________________________________________________ 21

Final Preparation _________________________________________________ 21

Service & Registration ________________________________________________ 22

2

Advertising
This manual is related to the following products:

200