Infrared natural gas heater, Installation, Continued – Vanguard Heating VN1800TB User Manual

Page 10

Advertising
background image

10

104820

INFRARED NATURAL GAS HEATER

®

Figure 12 - Gas Connection

* A CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable
alternative to test gauge connection. Purchase the optional CSA/AGA design-certified
equipment shutoff valve from your dealer. See Accessories, page 22.

Inlet Pipe From Gas
Meter (7" W.C. to
10.5" W.C. Pressure)

CONNECTING TO GAS
SUPPLY

WARNING: A qualified service

person must connect heater to
gas supply. Follow all local codes.

Typical Inlet Pipe Diameters

VN1800TB

3/8" or greater

VN3000TB

1/2" or greater

Installation must include an equipment
shutoff valve, union, and plugged 1/8" NPT
tap. Locate NPT tap within reach for test
gauge hook up. NPT tap must be upstream
from heater (see Figure 12).

Install sediment trap in supply line as shown
in Figure 12. Locate sediment trap where it
is within reach for cleaning. Locate sedi-
ment trap where trapped matter is not likely
to freeze. A sediment trap traps moisture
and contaminants. This keeps them from
going into heater controls. If sediment trap
is not installed or is installed wrong, heater
may not run properly.

IMPORTANT:

Hold pressure regulator

with wrench when connecting it to gas pip-
ing and/or fittings.

CAUTION: Use pipe joint seal-

ant that is resistant to liquid pe-
troleum (LP) gas.

IMPORTANT:

Check gas line pressure be-

fore connecting heater to gas line. Gas line
pressure must be no greater than 14 inches
of water. If gas line pressure is higher,
heater regulator damage could occur.

WARNING: Never connect

heater to private (non-utility) gas
wells. This gas is commonly
known as well-head gas.

CAUTION: Use only new,

black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of large
enough diameter to allow proper
gas volume to heater. If pipe is
too small, undue loss of pres-
sure will occur.

INSTALLATION

Continued

Tee Joint

Reducer
Bushing to
1/8" NPT

1/8" NPT
Plug Tap

Test
Gauge
Connection *

Sediment
Trap

Tee Joint

Pipe Nipple

Cap

Equipment Shutoff
Valve *

3/8" NPT
Pipe Nipple

Ground Joint
Union

Heater
Cabinet

3" Minimum

Pressure Regulator

IMPORTANT:

Install an equipment shutoff

valve in an accessible location. The equip-
ment shutoff valve is for turning on or
shutting off the gas to the appliance.

Apply pipe joint sealant lightly to male
threads. This will prevent excess sealant
from going into pipe. Excess sealant in pipe
could result in clogged heater valves.

WARNING: This appliance re-

quires a 3/8" NPT (National Pipe
Thread) inlet connection to the
pressure regulator.

Advertising
This manual is related to the following products: