Owner’s manual, Pre-installation preparation, General venting – Vanguard Managed Solutions BHDV34PB User Manual

Page 5: Continued, Location of vent termination

Advertising
background image

5

106516

OWNER’S MANUAL

29"

13"

12

5

/

8

"

34

3

/

8

"

35

1

/

16

"

58"

9

1

/

4

"

41"

Nailing Tabs

PRE-INSTALLATION
PREPARATION

Continued

Figure 6 - Framing Clearances for Corner Installation

LOCATION OF VENT
TERMINATION

When locating vent termination, it is impor-
tant to observe the minimum clearances
shown in Figure 8, page 6. You will avoid
extra framing by positioning your fireplace
against an already existing framing mem-
ber. The sides of the fireplace may be posi-
tioned directly against combustible walls.

*Check with local codes or with the current
CAN/CGA B149 [.1 or .2] Installation Codes
for Canada or the USA Installations follow
the current National Fuel Gas Code, ANS
Z223.1
, also known as NFPA 54.

These models are approved for use with
Simpson Dura-Vent 6

5

/

8

" direct-vent pipe

components and terminations as well as both
flex and rigid Vanguard vent components.

Your fireplace is approved to be vented either
through the side wall, or vertically using the
following guidelines:

• Only use Vanguard or Simpson Dura-

Vent GS venting components or kits spe-
cifically approved for this fireplace.

• Minimum clearance between vent pipes

and combustible materials is 1" (25 mm),
except where stated otherwise.

• Combustible material may be flush with

the top front of fireplace with a maxi-
mum thickness of 3/4".

• Do not recess venting terminals into a

wall or siding.

• You must install a vinyl siding standoff if

vinyl siding is covering the exterior wall.

• Install horizontal venting with a 1/4" rise for

every 12" of run toward the termination.

• You may paint the vent terminal with

450ºF (232ºC) heat-resistant paint to co-
ordinate with the exterior finish.

• There must not be any obstruction such

as bushes, garden sheds, fences, decks,
or utility buildings within 24" from the
front of the termination cap.

• Do not locate termination cap where ex-

cessive snow or ice build up may occur.
Be sure to clear vent termination area af-
ter snow falls to prevent accidental block-
age of venting system. When using snow
blowers, do not direct snow towards vent
termination area.

GENERAL VENTING

C

B

A

D

E

F

G

Top of Louver Opening

3

2

1

4

5

6

7

Wall

Figure 7 - Clearances for Combustible Mantels

Ref.

Mantel Depth

Ref. Mantel from Top

of Louver Opening

1

14" (356mm)

A

16" (406mm)

2

12" (305mm)

B

14" (356mm)

3

10" (254mm)

C

12" (305mm)

4

8" (203mm)

D

10" (254mm)

5

6" (152mm)

E

8" (203mm)

6

4" (101mm)

F

6" (152mm)

7

2" (51mm)

G

4" (101mm)

Continued

Note: There must be
a minimum clear-
ance of 18" above
top of louver
opening when
installing a television
or entertainment
center above the
fireplace.

Advertising